A setout marks the perimeter of a building in relation to the boundaries. The marks/pegs are "offset" or positioned away from the building line. Subsequent tradespeople then use these marks as a starting point for their work.
The setout is generally completed after the site scrape or excavation and before the plumber, electrician, or concreter attends the site.
For Finn Setouts to be able to start on a site, some documentation is required:
All sites require the definition of the title boundaries. If possible, the site should be cleared and excavated. Some other site requirements include: